The first step was to fund and commission a feasibility study. This study was funded by a $50,000 legacy grant awarded to AMPC by Park Pride, plus $50,000 in matching funds from individual donors. This study proposed a number of projects, some of which are currently underway (invasive species removal and installation of sidewalks; keep reading for more on these two projects).