The total cost of the playground was about $400,000. This funding provided for:
- design and consulting
- removal of old playground equipment
- relocation of an existing tree
- purchase and installation of:
– new playground equipment
– rubber safety surface (not recycled tires)
– benches and picnic tables
– trash receptacles (to be installed Spring 2017)
– freeze-resistant water fountain, hydrant, and pet water bowl (Spring/Summer 2017)
– bike racks