What progress has been made?

The first step was to fund and commission a feasibility study.  This study was funded by a $50,000 legacy grant awarded to AMPC by Park Pride, plus $50,000 in matching funds from individual donors.  This study proposed a number of projects, some of which are currently underway (invasive species removal and installation of sidewalks; keep reading for more on these two projects).

Copyright 2013

Design by : Mars Multimedia Pvt Ltd