What are some highlights of the project?

According to GDOT:

  • Northside Drive will have 3 lanes, one lane heading north, one lane heading south and a dedicated middle turn lane.
  • There will be some temporary road closings as required for construction; details will be provided at GDOT’s next Open House (date TBD).  To see information that has been shared to date, click here.
  • The new Northside Drive bridge will have improved pedestrian and bike access; on the west side, the bridge will accommodate a 5-foot sidewalk and on the east side, there will be a detached 10-foot multi-use path bridge crossing Peachtree Creek.