What are some highlights of the project?

According to GDOT:

* Northside Drive will have 3 lanes, one lane heading north, one lane heading south and a dedicated middle turn lane.

* There will be some temporary road closings as required for construction.

* The new Northside Drive bridge will have improved pedestrian and bike access; on the west side, the bridge will accommodate a 5-foot sidewalk and on the east side, there will be a detached 10-foot multi-use path bridge crossing Peachtree Creek.